What Is a Proof of Concept for SAP Integration? Why Do You Need One?
Mateusz
A Proof of Concept (PoC) is a small, controlled implementation designed to validate that a specific SAP system can technically and functionally connect to another system or platform, before committing to a full-scale integration or transformation.
From the outside, connecting to SAP can look straightforward: expose an API, authenticate, and exchange data. In practical scenarios, SAP landscapes are complex, such as security models, system versions, network boundaries, and governance rules that do not typically exist in most SaaS environments.
A PoC answers one fundamental question that most SaaS vendors typically have in their initial SAP connectivity discovery phases:
“Can this SAP connector work in our landscape, with our constraints, and in a reliable, secure way?”
Building an SAP connector usually involves security constraints, network boundaries, system versions, authentication mechanisms, and performance expectations.
A PoC helps reduce uncertainty by testing these aspects early and protecting your product roadmap.
Why PoCs Are Important in SAP Projects
A Proof of Concept turns SAP from an unknown risk into a known design constraint.
In complex SAP landscapes, that distinction matters more than most teams realise. On paper, many integration approaches look viable. In reality, SAP systems come with constraints around security, networking, authorisations, performance, and governance that only become visible once you actually try to connect.
A well-executed PoC surfaces those constraints early, when they are still inexpensive to address. It saves months of rework by validating assumptions upfront. You’ll be able to reduce technical and architectural risk, make informed design and platform decisions, avoid costly redesigns later in the project, and build confidence with internal stakeholders and enterprise customers.
Just as importantly, it creates alignment. Everyone involved, product teams, architects, security teams, and business stakeholders, gets a shared understanding of what is feasible and what is not.
When a PoC is skipped, the consequences tend to show up later, such as integration redesigns midway through delivery, customer-specific workarounds that don’t scale, security or compliance rejections late in the sales cycle, and long and unpredictable onboarding timelines for enterprise customers.
By the time these issues surface, teams are already committed to timelines, contracts, and delivery expectations.
When Is a SAP Integration PoC Typically Needed?
In practice, proof of concepts are most commonly executed when you want to validate connectivity between:
- SAP ECC or S/4HANA and non-SAP systems
- SAP S/4HANA and SAP Business Technology Platform
- On-premise SAP systems and cloud-based applications
- SAP Fiori / UI5 applications and backend services
- SAP APIs and external platforms
Each of these scenarios introduces different technical and security considerations. A PoC helps determine if the integration works and how it should be designed to survive real-world enterprise conditions.
What Is Usually Proven in an SAP Connectivity PoC
A well-defined SAP connectivity PoC is not about building a complete solution or ticking off every requirement. Its purpose is much more focused. It aims to validate a small number of critical assumptions that will determine whether an integration can realistically succeed in a real customer landscape.
In practice, a well-designed SAP integration PoC typically proves the following areas.
1. Connectivity and Network Access
This is often the first, and hardest, question to answer.
Before anything else, a Proof of Concept needs to confirm whether your SaaS platform can actually reach the SAP system. On paper, connectivity looks simple. In reality, enterprise SAP systems sit behind firewalls, private networks, and strict security boundaries.
At this stage, the PoC helps clarify these questions:
- Can our SaaS application reach the SAP system at all?
- Are firewalls, VPNs, private endpoints, or reverse proxies required?
- Can SAP Business Technology Platform act as a secure intermediary?
- Does the chosen integration protocol actually work in this landscape (RFC, OData, REST, SOAP, IDoc, events)?
Many PoCs fail at this point, and that is not a bad outcome. Discovering connectivity blockers early prevents far more painful surprises later, when customers, contracts, and timelines are already in place.
2. Authentication and Security
Security is rarely negotiable in SAP environments, and assumptions made here are often the most expensive to correct later. A PoC must demonstrate how authentication and authorisation will work in practice, not just in theory.
This includes validating:
- How the SaaS platform authenticates with SAP (OAuth 2.0, certificates, SSO)
- Whether technical users are sufficient or if principal propagation is required
- How credentials, tokens, and secrets are stored and rotated
- Whether SAP authorisations are enforced correctly at runtime
If security cannot be implemented cleanly and understandably during a PoC, it is very unlikely to be approved for production use by enterprise customers.
3. API and Data Model Compatibility
SAP data models often surprise teams who are new to the ecosystem. Objects that look simple at first glance may span multiple tables, services, or business rules.
A PoC helps answer practical questions such as:
- Which APIs are actually available in the target SAP system?
- Do standard SAP APIs expose the data required for your use case?
- Is the data granular enough, or are key fields missing?
- Are there payload size or performance limitations?
This is particularly important when working with standard SAP APIs versus custom extensions. A Proof of Concept prevents designing an integration around assumptions that the SAP data model simply does not support.
4. Transactional Behaviour and Consistency
Unlike many SaaS platforms, SAP is often the system of record, which changes how integrations must behave.
A Proof of Concept should validate how transactional behaviour is handled in real scenarios, including:
- How consistency is maintained across systems
- What happens when errors occur partway through a process
- Whether asynchronous processing or event-based patterns are required
Without this validation, it is easy to design an integration that works technically but fails operationally, especially under actual business conditions.
5. Performance and Scalability Assumptions
Even though a PoC is small, it should still test basic performance characteristics.
This includes understanding:
- Typical response times under light load
- Timeout behaviour and failure modes
- Retry logic and error-handling patterns
SAP systems are not designed for uncontrolled API bursts. A Proof of Concept helps define safe consumption patterns that protect both SAP and your SaaS platform as usage scales.
An Example of a Proof of Concept for Connecting a Non-SAP SaaS Solution to SAP (S/4HANA Integration Consisting of 3 Endpoints)
A realistic SAP integration PoC is intentionally small, controlled, and focused. Its purpose is not to prove everything, but to validate the most critical assumptions without introducing unnecessary complexity.
A realistic SAP integration Proof of Concept can often be completed in 2–3 weeks, depending on access and the environment complexity.
Below is a typical Proof of Concept scenario for SaaS vendors who want to integrate their non-SAP platform with SAP S/4HANA.
Scenario Overview
A SaaS vendor provides an external operational platform (for example, procurement, logistics, workforce, or analytics). Enterprise customers want this platform to read from and write to SAP, while SAP remains the system of record.
The objective of this Proof of Concept is to demonstrate that a non-SAP SaaS product can connect securely to SAP S/4HANA, Exchange business data reliably, and handle real-world error and consistency scenarios.
The goal of the PoC is not to build a full integration, but to prove that end-to-end connectivity, security, and behaviour work as expected.
PoC Scope: S/4HNA Integration, consisting of 3 Endpoints
The PoC validate integration consisting of 3 endpoints connecting to S/4HANA with conversions and logic managed by the customer product team.
Endpoint 1: Read Master Data from SAP (Business Partner)
Purpose: Validate secure, read-only access to SAP master data.
Why This Endpoint Is Chosen: Almost every SAP integration starts with master data. Business Partners are widely used and well governed in S/4HANA, making them ideal for PoC validation.
What the PoC Proves
- Network connectivity between SaaS and SAP
- Authentication and authorisation setup
- SAP data model compatibility
Typical Interaction
- SaaS calls SAP Business Partner OData API
- SAP returns a limited set of partner records
Key Questions Answered
- Can the SaaS product securely access SAP data?
- Is the data structure usable outside SAP?
Endpoint 2: Create or Update a Transaction in SAP
Purpose: Validate that the SaaS product can safely write transactional data into SAP.
Why This Endpoint Is Chosen: Write access is where most SAP integrations fail—due to validation rules, authorisations, or business logic. Proving this early is critical.
What the PoC Proves
- Write permissions and security controls
- SAP business rule enforcement
- Error handling for invalid or incomplete data
Typical Interaction
- SaaS submits a transaction (e.g. order, confirmation, request)
- SAP validates and either accepts or rejects the request
Key Questions Answered
- Can external systems create or update SAP objects?
- How does SAP respond to incorrect data?
Endpoint 3: Status Update or Error Feedback from SAP
Purpose: Validate synchronisation and non-happy-path behaviour.
Why This Endpoint Is Chosen: Enterprise integrations fail not because of the happy path, but because of poor error handling and state mismatches.
What the PoC Proves
- Status synchronisation between systems
- Retry and idempotency behaviour
- Operational transparency
Typical Interaction
- SAP sends a status update or error response
- SaaS updates its internal state accordingly
Key Questions Answered
- Can both systems stay in sync over time?
- How are failures detected and recovered from?
At the end of the PoC, a validated integration flow for all three endpoints and documented security and connectivity requirements and recommendations for next steps (Pilot or MVP) will be delivered.
If you want a proof of concept for your first integration, contact us today. Or visit our offer page to learn more about pricing and scope.